WORK SCHEDULE AND LOCATIONS
Victoria Street (between Manning Street & Bryant Avenue)
Date: 7 April 2025 | Time: 9am– 2pm
Work Details: Installation of a new electrical cable across the road.
|
Marlborough Street (between Wellington Street & Boundary Road East)
Date: 11 April 2025 | Time: 7am-5pm
Work Details: Installation of a new electrical cable across the road.
|
Palmerston Street (between Wellington Street & McCabe Street)
Date: 14 April 2025 | Time: 9am-2pm
Work Details: Maintenance on a Western Power pole and decommissioning of a transformer.
|
TRAFFIC AND RESIDENT ACCESS
- Traffic will be detoured through neighboring streets during the works. Residents will still have access to their properties throughout the construction period.
- Western Power and the team will do their best to minimize disruptions, and we appreciate your patience as these essential upgrades take place! If you have any concerns, please reach out.